This King Air conversion climbs to FL250 in 15 minutes and cruises at 240+ kts.
Combine that with a burn rate of 68-72gph and N437CF is unlike any King Air 90
you’ve ever known.
The 751 shaft HP Walter M601E-11 engines provide bleed air pressurization that
eliminates the supercharger. Additionally, no “hot sections” or fuel nozzle
checks are required since they utilize a slinger ring fuel system.
• 1965 65-A90 N437CF
• Total Time Engines: 447
• Time Airframe: 9,126
• inspections up to date
• TAWS compliant
• STEC 65 Autopilot
|