2011 DASSAULT FALCON 2000LX
Reg # N790R
Inquire
Summary
– Fortune 50 Owned and Operated
– 2C Inspection Completed in May 2023
– Engines Enrolled on Pratt & Whitney ESP
– APU Enrolled on Honeywell MSP
– Airframe Enrolled on Honeywell HAPP
– Equipped with GoGo Wi-Fi
– Equipped with Synthetic Vision System and CPDLC
Airframe:
Total Time: 4,013.3
Total Landings: 2,176
Engines:
PRATT & WHITNEY PW308C
Time: 4013/3986
Cycles: 2176/2169
APU:
Time: 2146
– 2C Inspection Completed in May 2023
– Engines Enrolled on Pratt & Whitney ESP
– APU Enrolled on Honeywell MSP
– Airframe Enrolled on Honeywell HAPP
– Equipped with GoGo Wi-Fi
– Equipped with Synthetic Vision System and CPDLC
Airframe:
Total Time: 4,013.3
Total Landings: 2,176
Engines:
PRATT & WHITNEY PW308C
Time: 4013/3986
Cycles: 2176/2169
APU:
Time: 2146
Avionics
Honeywell EASy II Capabilities
– VHF Comm. Triple Honeywell VHF Transceivers
– ADM Dual Honeywell AZ-200 Air Data Modules
– ADS-B Out
– Displays 4 Honeywell DU 1310 Display Units
– HF Comm Dual Rockwell Collins HF Transceivers
– FANS 1/A
– Radio Altimeter Dual Honeywell Radio Altimeters
– TCAS Honeywell 3000 TCAS II
– CPDLC
– ADF Dual Honeywell Automatic Direction Finders
– DFDR Honeywell AR-120 Flight Data Recorder
– RVSM
– DME Dual Honeywell DME Modules
– CVR Honeywell Cockpit Voice Recorder
– XM Weather
– DTU Honeywell Data Transfer Unit 4G Fast Box
– HUD Rockwell Collins Heads Up Display
– RAAS
– GPS Dual Honeywell GPS w/ LPV
– SVS SmartView Synthetic Vision System
– VHF Comm. Triple Honeywell VHF Transceivers
– ADM Dual Honeywell AZ-200 Air Data Modules
– ADS-B Out
– Displays 4 Honeywell DU 1310 Display Units
– HF Comm Dual Rockwell Collins HF Transceivers
– FANS 1/A
– Radio Altimeter Dual Honeywell Radio Altimeters
– TCAS Honeywell 3000 TCAS II
– CPDLC
– ADF Dual Honeywell Automatic Direction Finders
– DFDR Honeywell AR-120 Flight Data Recorder
– RVSM
– DME Dual Honeywell DME Modules
– CVR Honeywell Cockpit Voice Recorder
– XM Weather
– DTU Honeywell Data Transfer Unit 4G Fast Box
– HUD Rockwell Collins Heads Up Display
– RAAS
– GPS Dual Honeywell GPS w/ LPV
– SVS SmartView Synthetic Vision System
Exterior
April 2017 (Duncan Battle Creek)
Color Matterhorn White with Slate Gray, Royal Blue, Starry
Night, and Light Blue Stripes
Color Matterhorn White with Slate Gray, Royal Blue, Starry
Night, and Light Blue Stripes
Interior
PAX 10 passengers
FWD 4 place club group
AFT 4 place conference group opposite 2 club seats
Galley Forward galley with coffee maker, convection oven
and microwave
LAV Aft lavatory
Additional ATG-5000 Wi-Fi, Airshow 410, Audio International
CMS
FWD 4 place club group
AFT 4 place conference group opposite 2 club seats
Galley Forward galley with coffee maker, convection oven
and microwave
LAV Aft lavatory
Additional ATG-5000 Wi-Fi, Airshow 410, Audio International
CMS
Additional Equipment
– ATG-5000 Wi-FI
– Honeywell MCS 7120 Satcom
–Collins Airshow 410
– Audio International Cabin Mangement System
– Falcon Broadcast
– Aircell AXXESS II Phone System
– Honeywell MCS 7120 Satcom
–Collins Airshow 410
– Audio International Cabin Mangement System
– Falcon Broadcast
– Aircell AXXESS II Phone System
Modifications / Conversions
– SB301 & 302 Enhanced Nav w/ LPV & ADS-B Out
– SB303 SmartView SVS (Sythetic Vision System)
– SB304 R1 Auto Descent Mode
– SB305 Dual Charts
– SB306 QAR, XM Graphical Weather
– SB 308 & 309 CPDLC & FANS 1/A
– SB310 VDR 3 Module Capable of VDL Mode 2
– SB450 Honeywell EASY II Cert. 4 w/ Push to Load Function
– SB477 Honeywell Data Transfer Unit 4G Fast Box
– SB303 SmartView SVS (Sythetic Vision System)
– SB304 R1 Auto Descent Mode
– SB305 Dual Charts
– SB306 QAR, XM Graphical Weather
– SB 308 & 309 CPDLC & FANS 1/A
– SB310 VDR 3 Module Capable of VDL Mode 2
– SB450 Honeywell EASY II Cert. 4 w/ Push to Load Function
– SB477 Honeywell Data Transfer Unit 4G Fast Box
Remarks
– 12 Month / 800 Hour May 2023 May 2024
– 24 Month / 1600 Hour May 2023 May 2025
– 36 Month / 2400 hour May 2023 May 2026
– 2B Inspection Mar. 2019 N/A
– 3B Inspection May 2023 N/A
– 1C Inspection May 2023 N/A
– 2C Inspection May 2023 N/A
– 3C Inspection N/A May 2029
– 4C Inspection N/A May 2035
– 24 Month / 1600 Hour May 2023 May 2025
– 36 Month / 2400 hour May 2023 May 2026
– 2B Inspection Mar. 2019 N/A
– 3B Inspection May 2023 N/A
– 1C Inspection May 2023 N/A
– 2C Inspection May 2023 N/A
– 3C Inspection N/A May 2029
– 4C Inspection N/A May 2035