1997 LEARJET 31A
$1,095,000
Summary
Airframe:
Total Time: 8,208
Total Landings: 6,622
Engines:
Honeywell TFE731-2-3B
Enrolled on MSP Gold
Right: 8101.7 hours / 6517 cycles
Left: 8174.9 hours / 6589 cycles
Honeywell TFE731-2-3B
Enrolled on MSP Gold
Right: 8101.7 hours / 6517 cycles
Left: 8174.9 hours / 6589 cycles
Total Time: 8,208
Total Landings: 6,622
Engines:
Honeywell TFE731-2-3B
Enrolled on MSP Gold
Right: 8101.7 hours / 6517 cycles
Left: 8174.9 hours / 6589 cycles
Honeywell TFE731-2-3B
Enrolled on MSP Gold
Right: 8101.7 hours / 6517 cycles
Left: 8174.9 hours / 6589 cycles
Avionics
•ADF: Dual Honeywell DF-431 B
• AHRS: Dual Honeywell KAU-461
• ALT: Dual Honeywell KAV-485
• Autopilot: Dual Honeywell KCP-420
• Comms: Dual Honeywell VC-401B
• CVR: 30A
• DME: Honeywell DM-441B
• EFIS: Honeywell ED551A 5-tube
• FMS: Universal UNS-1E
• NAV: Dual Honeywell VN-411B
• TAWS: Honeywell Mark VII EGPWS
• TX: Dual Bendix MST-70B MODE S
• WX: Honeywell ART-2000
• AHRS: Dual Honeywell KAU-461
• ALT: Dual Honeywell KAV-485
• Autopilot: Dual Honeywell KCP-420
• Comms: Dual Honeywell VC-401B
• CVR: 30A
• DME: Honeywell DM-441B
• EFIS: Honeywell ED551A 5-tube
• FMS: Universal UNS-1E
• NAV: Dual Honeywell VN-411B
• TAWS: Honeywell Mark VII EGPWS
• TX: Dual Bendix MST-70B MODE S
• WX: Honeywell ART-2000
Exterior
Overall Matterhorn White with green and black
striping
striping
Interior
8 passenger configuration with belted lavatory
upon entry, 4-place club in the mid-cabin and
rear 3-place bench in the aft cabin. Overall tan
leather interior with light cream sidewalls and
headliner.
upon entry, 4-place club in the mid-cabin and
rear 3-place bench in the aft cabin. Overall tan
leather interior with light cream sidewalls and
headliner.
Additional Equipment
12-year inspection completed June 2023
Phase A&B completed June 2023
$750,000 worth of work completed!
New Windshields
Fresh MPI & CZI (overhauled engines)
R-134A Freon Air Conditioning
Single Point Refueling
Flushing Lavatory
Phase A&B completed June 2023
$750,000 worth of work completed!
New Windshields
Fresh MPI & CZI (overhauled engines)
R-134A Freon Air Conditioning
Single Point Refueling
Flushing Lavatory
Remarks
Phase A (12 mo) – due 5/2024
Phase B (24 mo) – due 5/2025
Phase C (48 mo) – due 6/2025
Phase D (96 mo) – due 7/2028
12-year – due 2035
Gear retraction and extension actuators
overhauled 6/2023
Phase B (24 mo) – due 5/2025
Phase C (48 mo) – due 6/2025
Phase D (96 mo) – due 7/2028
12-year – due 2035
Gear retraction and extension actuators
overhauled 6/2023