2019 PILATUS PC-12 NG
Reg # D-FPAN
Inquire
Summary
Fresh 300/600 Hour Inspection (Apr 2025). ADS-B Out, WAAS/LPV, Coupled VNAV. Elite Avionics Package, EU Ops, SmartView SVS, Wireless Connected Flight Deck.
Airframe:
Total Time: 1,286.4
Total Landings: 1,261
Engines:
PRATT & WHITNEY PT6A-67
Time: 1286
TBO: 3500
Props:
Hartzell
Time: 20
Airframe:
Total Time: 1,286.4
Total Landings: 1,261
Engines:
PRATT & WHITNEY PT6A-67
Time: 1286
TBO: 3500
Props:
Hartzell
Time: 20
Avionics
Elite Avionics Package:
• Dual Honeywell KGS-200 GPS
• Copilot Audio & Market Panel
• Iridium SATCOM w/Antenna
• L3 WX-500 Stormscope
• Bendix/King KMH-980 Class B TAWS/TCAS I
• Dual Mode S Transponders w/Diversity
• Honeywell ART2100 RDR-2060 Weather Radar
• Dual Honeywell Chartlink
• Electronic Checklists
• Wireless Connected Flight Deck
• SmartViewTM Synthetic Vision System
• Steep Approach Capability
• Honeywell Dual ChartLink
• Dual Honeywell KGS-200 GPS
• Copilot Audio & Market Panel
• Iridium SATCOM w/Antenna
• L3 WX-500 Stormscope
• Bendix/King KMH-980 Class B TAWS/TCAS I
• Dual Mode S Transponders w/Diversity
• Honeywell ART2100 RDR-2060 Weather Radar
• Dual Honeywell Chartlink
• Electronic Checklists
• Wireless Connected Flight Deck
• SmartViewTM Synthetic Vision System
• Steep Approach Capability
• Honeywell Dual ChartLink
Exterior
Overall gray exterior, with Ferrari red and black accents.
Interior
Executive interior features a forward four place club setting, two aft forward facing seats and two jump seats. All seating with quilted facings (backs and bottoms).
Additional Equipment
EU-OPS Commercial Operations Package
• Pulsing Recognition Lights
• 77 Cu Ft (Large) Oxygen System w/Drop Down Masks
• Life Vests for Cockpit and Cabin
• First Aid Kit Installation
German Certification Kit
• Pulsing Recognition Lights
• 77 Cu Ft (Large) Oxygen System w/Drop Down Masks
• Life Vests for Cockpit and Cabin
• First Aid Kit Installation
German Certification Kit
Remarks
EASA Part 145 Operated, EU-OPS
Fresh 300/600/1200/2400 Hour Inspection c/w April 2025
ADS-B Out, WAAS/LPV, Coupled VNAV
Full Status Report Available Upon Request
Fresh 300/600/1200/2400 Hour Inspection c/w April 2025
ADS-B Out, WAAS/LPV, Coupled VNAV
Full Status Report Available Upon Request
