Aircraft

Mente Group
3201 Dallas Parkway
Suite 777
Frisco TX 75034
Aircraft Summary
  • – One Fortune 500 Operator Since New
  • – Delivers with Bombardier Post-Lease Inspection
  • – Engines enrolled on RRCC, APU enrolled on MSP
  • – Airframe enrolled on SmartParts
  • – Batch 3.4, DU-875 Cockpit Upgrades
  • – Flap Drainage Service Bulletin


    Airframe:
  • Total Time: 6,224
  • Total Landings: 2,470


    Engines:
  • ROLLS ROYCE
  • Time: 6224/6224
  • Cycles: 2470/2470

  • APU:
  • Time: 5456
Avionics
  • Primus Elite 2000XP Integrated Avionics System
  • – (3) IC-800 Integrated Avionics Computer
  • – (3) AZ-940 Air Data Computer
  • – (2) HF-9031A HF Receiver
  • – (4) DA-810 Data Acquisition Unit
  • – (2) WC-880 Radar Control Panel
  • – HST-2110 High Speed Transceiver
  • – (6) DU-875 LCD Display Unit
  • – (3) ALT-4000 Radio Altimeter Transceiver
  • – SRT-2100 Satcom Transceiver
  • – (3) CD-820 Control Display Unit
  • – (2) RNZ-851 Navigation Receiver
  • – SSFRD Flight Data Recorder
  • – (3) LASEREF IV Inertial Reference Unit
  • – (2) RCZ-833M VHF Comm. Unit
  • – HFR5-V Cockpit Voice Recorder
Additional Equipment
  • – HUD/EVS
  • – TCAS 7.1
  • – CPDLC / FANS 1/A+
  • – SBAS w/ LPV
  • – Synthetic Vision
  • – Datalink 2000
  • – EGPWS w/ Windshear Detection and RAAS
  • – Batch 3.4 (SB700-1A11-31-021)
  • – Increased MTOW to 92,500 (SB700-1A11-11-008)
  • – Flap Corrosion & Drainage (SB700-1A11-57-016, -019, -020)
  • – Collins Cabin Electronics System (CES)
  • – FWD RH 24” bulkhead monitor
  • – AFT LH 24” bulkhead monitor
  • – 21” stowable credenza monitor
  • – Gogo Biz AVANCE L5
Interior
  • PAX – 13
  • Galley – FWD with microwave, oven, and coffee maker
  • FWD – Four club seats
  • AFT – Four place conference group opposite credenza
  • MID – Two club seats opposite three place divan
  • Lav – FWD crew and AFT cabin lavatories
Exterior
  • Base – Matterhorn White
  • Stripes – Sherwin Williams Black, Las Vegas Gold
  • Remarks
    • Inspection Status:
    • 15 Month Dec. 2024 Jun. 2026
    • 30 Month Dec. 2024 Sept. 2027
    • 60 Month Jan. 2023 Apr. 2028
    • 120 Month Feb. 2018 Apr. 2028
    • 180 Month Jan. 2023 Apr. 2038
    • 240 Month – Apr. 2028