Aircraft

FX Solutions
Aircraft Summary
  • > Airframe Enrolled on EEC Standard
  • > Enhanced Takeoff Package
  • > Passenger Seats Refurbished 2021
  • > G1000 NXi Upgrade
  • > Engines Enrolled on ESP Platinum
  • > Engine Overhauls Completed July 2025


    Airframe:
  • Total Time: 3,540
  • Total Landings: 2,880


    Engines:
  • PRATT & WHITNEY PW617FE
  • Time: 3410
  • Cycles: 2753
  • Hot Section Due: 5,045 Hrs
  • Overhaul Due: 6,795 Hrs
Avionics
  • Embraer Prodigy Flight Deck Garmin G1000NXi Avionics System
  • 3- 12-Inch Garmin Displays
  • Garmin GFC-700 Automatic Flight Control System
  • Dual AHRS
  • Dual RVSM Compliant Digital Air Data Computers
  • Dual Radio Modules
  • Dual Digital Audio Control Systems
  • Engine Indication and Crew Alerting System w/Centralized Maintenance
  • Computer Like Functionality
  • Class B Terrain Awareness and Warning System (TAWS)
  • Garmin Weather Radar

  • AVIONICS ENROLLED ON EEC STANDARD
Additional Equipment
  • Garmin G1000NXi Upgrade
  • Enhanced Takeoff Package
  • Synthetic Vision
  • Garmin GDL-69 SXM Satellite Weather/Radio
  • GTX-345R Transponder (ADS-B In/Out)
  • TCAS
  • Premium Entry Door
  • Bose Jacks Throughout
  • Life Vests
  • Smoke Goggles
  • Rosen Sun Visors
  • ChartView – Jeppesen Charts
  • Electronic Checklist
  • Safe Taxi
  • RVSM Capable
  • Single Pilot Operation
Interior
  • 4-place “Topaz” Interior Scheme Which Includes Taupe Seats and Upholstery with Mahogany Accents and
  • Cabinetry. Powder Coating of Cabin Profiles/Rails, with Cockpit Side Window Defogging Improvement. Aft Lav
  • with Flushable Toilet and Cabinet. Crew Seats Refurbished Apr 2020 and Passenger Seats Refurbished April
  • 2021. New Cockpit and Baggage Deck Covering Replaced Dec 2025.
Exterior
  • Matterhorn White with Copper and Espresso Accent Stripes. Original Paint 2009.
  • Remarks
    • Inspection Status:
    • 12 Month March 2026
    • 24 Month April 2027
    • 36 Month April 2027
    • 48 Month April 2029
    • 60 Month March 2029
    • 120 Month May 2029
    • 800 Hr 3774 Hrs
    • 1600 Hr 3926 Hrs
    • 2400 Hr 4231 Hrs
    • 3200 Hr 6174 Hrs
    • 5600 Hr 5600 Hrs
    • 6400 Hr 6400 Hrs